Template talk:East Lancashire Line

From WikiProjectMed
Jump to navigation Jump to search

Accrington

Accrington station was triangular, with platforms on two of the three sides, but this RDT has been drawn with a station dot on only one side, that between Church and Huncoat. The missing platforms were on the south-to-east curve, that is, the side used by trains running from Bury to Colne. The RDT should be fixed to reflect that; but I don't know the best way of doing it. The station dot should be drawn in pink, to denote that the platforms are closed. --Redrose64 🌹 (talk) 21:27, 4 June 2023 (UTC) [reply]

Rishton Tunnel
Rishton- first station
Rishton- second station
Church and Oswaldtwistle
Great Harwood
Accrington
Simonstone
Huncoat- second station
Huncoat- first station
Hapton
Padiham
Rose Grove
@Redrose64: With reference to [1], Like this? — Preceding unsigned comment added by Bazza 7 (talkcontribs) 15:47, 5 June 2023 (UTC)[reply]
@Bazza 7: Yes, that's right. --Redrose64 🌹 (talk) 21:39, 5 June 2023 (UTC)[reply]
@Redrose64: Done. Bazza (talk) 08:24, 6 June 2023 (UTC)[reply]
Thank you --Redrose64 🌹 (talk) 11:41, 6 June 2023 (UTC)[reply]