Talk:Tunnel A1 (Ivan)

From WikiProjectMed
Jump to navigation Jump to search

Tunnel Ivan beginning redesign this year!

As of January 2020, preparations have begun on Hercegovina point of the tunnel (Tarcin). Tunnel Ivan will take 30 months to upgrade the tunnel.[1] User:AustroHungarian1867

References