Talk:Process capability index/Archives/2016

From WikiProjectMed
Jump to navigation Jump to search

Table for sigma levels

Either this table, or the table in the wikipedia article with the following link is wrong: http://en.wikipedia.org/wiki/Six_Sigma#Sigma_levels

I am not an expert, so please someone revise it. --59.66.122.148 (talk) 13:08, 9 January 2014 (UTC)

No, they're correct. For process capability to be valid, the process must be stable, so yields of Φ(sigma level) - Φ(-sigma level) as given in the table (in the article coupled with this talk page) are correct. As the Six Sigma article indicates, the yields presented there represent the worst case deterioration of 1.5σ before a control chart is expected to catch the shift or drift, so yields of Φ(sigma level - 1.5) - Φ(-sigma level - 1.5) (for a shift or drift upward; a shift or drift downward is equivalent—you can do the math) are correct in that article. No action required. -- DanielPenfield (talk) 10:02, 27 January 2014 (UTC)

Example shown has a std. deviation that seems to not match chart data. Mu hat estimate (98.94) is correct, but estimated chart data std. deviation is ~0.869 (unbiased) or ~0.842 (std. population deviation), not 1.03, as stated.

..unless I am missing something or a different method is used for this? Any comments/clarification very welcomed and appreciated.

165.225.34.90 (talk) 23:09, 5 November 2016 (UTC)