Talk:Murray River railway bridge, Albury–Wodonga

From WikiProjectMed
Jump to navigation Jump to search

Contradiction

The article states that from 2011 the bridge carried two standard-gauge tracks, further on that one is "currently" not used. Later, in the "Heritage listing" section, the bridge is carrying one standard and one broad gauge track. Can someone clarify? Doug butler (talk) 04:02, 10 May 2021 (UTC)[reply]