Coordinates: 17°52′18″N 80°53′09″E / 17.87167°N 80.88583°E / 17.87167; 80.88583

Sitamma Sagar Barrage

From WikiProjectMed
Jump to navigation Jump to search
Sita Rama Lift Irrigation Project
Sitamma Sagar Barrage is located in Telangana
Sitamma Sagar Barrage
Sitamma Sagar Barrage at Dummugudem
Sitamma Sagar Barrage is located in India
Sitamma Sagar Barrage
Sitamma Sagar Barrage (India)
Official nameSita Rama Lift Irrigation Project
CountryIndia
LocationDummugudem, Bhadradri Kothagudem District
Coordinates17°52′18″N 80°53′09″E / 17.87167°N 80.88583°E / 17.87167; 80.88583
PurposeMulti-purpose
StatusUnder construction
Construction cost2,500–5,000 crores[1]
Built byLarsen & Toubro[2]
Owner(s)Government of Telangana
Operator(s)Irrigation & CAD Department, Government of Telangana
Dam and spillways
Type of damBarrage
ImpoundsGodavari River
Height68 meters
Height (foundation)20 meters
Length1,263 meters (Overflow section) | 109.75 meters (Non-overflow section - 50 meters on Left and 59.7 meters on Right)
Spillways52 Nos, 15.0m x 15.0M (Radial) and 13 Nos.,15.0M x 16.0M
Spillway capacity88,614 Cumecs
Reservoir
CreatesSita Rama Lift Irrigation Project
Total capacity36.576 tmcft
Catchment area2,81,000 km2
Sita Rama Lift Irrigation Project
Operator(s)Telangana State Power Generation Corporation Limited
Commission datePlanned
TypeBarrage
Hydraulic head16.50m (Gross head)/ 14.85 (Net head)
Turbines8x40MW
Installed capacity320 MW
Annual generation1016.88 MU (at 50% dependability)

Sita Rama Lift Irrigation Project[3][4][5] is an under-construction barrage across Godavari River with run-of-river hydroelectric power project at Dummugudem village, Bhadradri Kothagudem district in Telangana. The project is proposed at about 200 meters downstream of the existing Dummugudem anicut built about 150 years ago.

History

Prior to Bifurcation of Andhra Pradesh, two project namely Rajiv Dummugudem Lift Irrigation Scheme and Indira Sagar Rudram Kota Lift Irrigation Scheme were proposed in order to cater to the irrigation needs of the left out ayacut from existing irrigation schemes. Even after execution of this scheme, about 2.55 Lakh Acres would still remain to be covered by any future irrigation scheme. After bifurcation of Andhra Pradesh, seven Mandals of Khammam district were merged in West Godavari district of Andhra Pradesh. In this process the intake structure of proposed Indira Sagar Lift Irrigation Scheme went into the administrative boundary of Andhra Pradesh.

In view of above, Government of Telangana decided not only to integrate earlier proposed Indira Sagar and Rajiv Sagar Lift Irrigation Scheme into one lift irrigation scheme but also to cover the Gap Ayacut which is not coming under any present or future irrigation scheme. Accordingly, the project is now renamed as Sita Rama Lift Irrigation Scheme[6] is being formulated to cover about 9.36 Lakh Acres of Khammam, Bhadradri Kothagudem and Mahabubabad Districts of Telangana. The project has been planned to execute in two phases. Phase – I of the Sita Rama Lift Irrigation Scheme will cover the Khammam, Bhadradri Kothagudem & Mahabubabad Districts whereas Phase – II will also cover the same districts. Phase – I of this scheme covers command area of 2,72,921 Ha with new ayacut of about 1,33,085 Ha and Stabilization of about 1,39,836 Ha.

Dummugudem Anicut is a 150-year-old masonry weir built across river Godavari near Dummugudem village in Badradri Kothagudem district of Telangana state. Keeping in mind the requirements of Sita Rama LIS, the State Government of Telangana has contemplated to augment the storage capacity and develop a run-of-river hydroelectric project by constructing a barrage across river Godavari at about 200 meters downstream of the existing Dummugudem anicut with pond level at 63.00m elevation.

The barrage is nearby to the temple town of Bhadrachalam where Sita Ramachandraswamy Temple is present. The temple is often referred to as Dakshina Ayodhya, Bhadradri or Bhadrachalam and is dedicated to Hindu god, Rama. The barrage is named after consort of Rama, Sita.

Sita rama Lift Irrigation Project[7]

Sita Rama Lift Irrigation Project will be constructed on the right side of the barrage and will have an installed capacity of 320 MW (8x40MW Bulb Turbine units). The project will generate 719.12 MU in a 90% dependable year, 765.04 MU in a 75% dependable year and 1016.88 MU in a 50% dependable year and around 999.48 MU per year on an average basis.

References

  1. ^ "Larsen & Toubro wins contract worth up to Rs 5,000 cr from Telangana govt". The Economic Times.
  2. ^ "Larsen & Toubro wins contract worth up to Rs 5,000 cr from Telangana govt". The Economic Times.
  3. ^ "To generate hydel power, Telangana government to build new barrage on Godavari". The New Indian Express.
  4. ^ Dec 6, TNN. "Telangana: Barrage to come up at Dummugudem | Hyderabad News". The Times of India.{{cite news}}: CS1 maint: numeric names: authors list (link)
  5. ^ "గోదావరిపై సీతమ్మ బ్యారేజీ, రెండేళ్లలో పూర్తి.. ఈ ప్రాజెక్ట్ విశేషాలివే!". Samayam Telugu (in Telugu).
  6. ^ "Sita Rama Lift Irrigation Project" (PDF). Department of Irrigation and CAD, Government of Telangana.
  7. ^ "Sitammasagar project scheduled by Sept. 2022". The Hindu. 2021-01-10. ISSN 0971-751X. Retrieved 2022-01-24.