New Central Wastewater Treatment Plant

From WikiProjectMed
Jump to navigation Jump to search

New Central Wastewater Treatment Plant
Map
General information
Typewastewater treatment plant
LocationSongino Khairkhan
Town or cityUlaanbaatar
CountryMongolia
Coordinates47°54′09″N 106°45′45″E / 47.90250°N 106.76250°E / 47.90250; 106.76250
Groundbreaking28 February 2019
CostUS$262.7 million
Grounds17.7 hectares

The New Central Wastewater Treatment Plant is a wastewater treatment plant under construction in Songino Khairkhan District, Ulaanbaatar, Mongolia.

History

The feasibility study to establish the plant was done in 2015. The construction of the plant was officiated on 2 February 2019 and constructed officially started on 28 February 2019 in a groundbreaking ceremony officiated by Prime Minister Ukhnaagiin Khürelsükh.[1] On 31 March 2022, concrete started to be poured into the inner walls of the plant three reaction tanks.[2]

Architecture

The plant is constructed in a 17.7 hectares of land. There are 35 buildings being constructed at the plant site.[1]

Technical specifications

Once completed, the plant will have a processing capacity of 250,000 m3 of wastewater per day.[2]

Finance

The plant costs US$262.7 million which was financed by a loan provided by the Government of China to the Government of Mongolia.[1]

See also

References

  1. ^ a b c Munkhbat, Amarjargal (22 September 2023). "Construction of new sewage treatment plant is slow as usual". UB Post. Archived from the original on 12 October 2023. Retrieved 27 November 2023.
  2. ^ a b Ma, Chengguang; Zhuang, Qiange (6 July 2022). "CREC4-built sewage plant in Ulaanbaatar reaches new milestone". China Daily. Archived from the original on 27 November 2023. Retrieved 27 November 2023.