Matiltan Hydropower Project
Jump to navigation
Jump to search
![]() |
Matiltan Hydropower Project is a proposed run-of-the-river hydro-power generation project which is located in the Gorkin Matiltan region of Kalam valley, District Swat, Khyber Pakhtunkhwa province of Pakistan, on the left tributary of Suvastu River. The power station has a planned generating capacity of 84 MW.[1][2]
Construction
In October 2020, the project was estimated to be 47 percent complete. The project has faced obstructive tactics from various government factions in an attempt to delay the project. [3]
References
- ^ "84 MW GORKIN-MATILTAN HYDROPOWER PROJECT". Barqaab. 2012-04-17. Retrieved 2022-09-04.
- ^ "Energy & Power". www.kpkep.gov.pk. Archived from the original on 2015-05-26.
- ^ Report, Bureau (2020-10-11). "CM orders timely completion of hydropower projects". DAWN.COM. Retrieved 2021-10-07.
Categories:
- Wikipedia neutral point of view disputes from June 2015
- All Wikipedia neutral point of view disputes
- Pakistan articles missing geocoordinate data
- All articles needing coordinates
- Articles missing coordinates without coordinates on Wikidata
- Hydroelectric power stations in Pakistan
- Proposed hydroelectric power stations
- Proposed renewable energy power stations in Pakistan
- All stub articles
- Hydroelectric power plant stubs
- Pakistani building and structure stubs
- Power station stubs