Klaipėda Combined Heat and Power Plant
Jump to navigation
Jump to search
Gren Klaipėda Combined Heat and Power Plant | |
---|---|
Official name | Gren Klaipėda termofikacinė elektrinė |
Country | Lithuania |
Location | Klaipėda |
Coordinates | 55°41′2″N 21°12′1.67″E / 55.68389°N 21.2004639°E |
Status | Operational |
Construction began | 2011 |
Commission date | 2013 |
Construction cost | 126 mil. EUR |
Operator(s) | Fortum Heat Lietuva |
Thermal power station | |
Primary fuel | Biomass |
Power generation | |
Nameplate capacity | 20 MW |
Annual net output | 140 GWh (power) 400 GWh (heat)[1] |
External links | |
Website | gren |
Gren Klaipėda, formerly Fortum Klaipėda, is combined heat and power plant in Klaipėda, Lithuania and it uses biomass and waste to produce energy.[2] Originally built in Klaipėda Free Economic Zone by Fortum Heat Lithuania which belongs to Finnish energy company Fortum.
Lithuanian president Dalia Grybauskaitė and Finnish president Sauli Niinistö both participated in the opening ceremony of the plant in 2013.[3]
References
Categories:
- Infobox mapframe without OSM relation ID on Wikidata
- Coordinates on Wikidata
- Thermal power station articles using Infobox power station
- Energy infrastructure completed in 2013
- 2013 establishments in Lithuania
- Cogeneration power stations in Lithuania
- Biofuel power stations in Lithuania
- Buildings and structures in Klaipėda
- Waste power stations in Lithuania
- Fortum
- All stub articles
- Power station stubs
- Lithuanian building and structure stubs
- Pages using the Kartographer extension