Coordinates: 02°50′53″S 29°48′29″E / 2.84806°S 29.80806°E / -2.84806; 29.80806

Kigoma–Butare–Ngozi–Gitega High Voltage Power Line

From WikiProjectMed
Jump to navigation Jump to search

Kigoma–Butare–Ngozi–Gitega High Voltage Power Line
Location
CountryRwanda and Burundi
Coordinates02°50′53″S 29°48′29″E / 2.84806°S 29.80806°E / -2.84806; 29.80806
General directionNorth to South
FromKigoma, Rwanda
Passes throughButare, Ngozi
ToGitega, Burundi
Ownership information
OwnerGovernment of Burundi & Government of Rwanda
PartnersEuropean Union & African Development Bank
OperatorREGIDESO Burundi & Rwanda Energy Group Limited
Construction information
ContractorsMultiple
Construction started2022
Expected2024
Construction cost€24.4 million
Technical information
Type of currentAC
Total length140.7 km (87.4 mi)
AC voltage220kV
No. of circuits1

The Kigoma–Butare–Ngozi–Gitega High Voltage Power Line, also Rwanda–Burundi High Voltage Power Line is a high voltage electricity power line, under construction, connecting the high voltage substation at Kigoma in Rwanda to another high voltage substation at Gitega in Burundi.[1]

Location

The 220 kilovolt power line starts at the Rwanda Energy Group (REG) 220kV substation in the town of Kigoma Rwanda, approximately 76.5 kilometres (48 mi), by road, southwest of Kigali, the capital and largest city of Rwanda.[2] From here, the power line travels to the southern Rwandan town of Butare (Huye), a road distance of about 51 kilometres (32 mi).[3] From Butare, the power line continues south to the international border with Burundi. It crosses the border and continues to the town of Ngozi, a road distance of approximately 75 kilometres (47 mi)[4]

From Ngozi, power line travels in a general southerly direction to the city of Gitega, the capital of Burundi, a road distance of approximately 83 kilometres (52 mi), ending at another 220kV substation, this one owned by REGIDESO Burundi.[5] The length of this power line is reported to be 140.7 kilometres (87 mi) from end to end, with 61.5 kilometres (38 mi) in Rwanda and 79.2 kilometres (49 mi) in Burundi.[6]

Overview

This power transmission line connects the electricity grid of Rwanda to that of neighboring Burundi. It is in line with the Nile Equatorial Lakes Subsidiary Action Program, Interconnection of Electric Grids Project,[6] led by Regional Manager, Grania Rubomboras.[7] The power line is being developed to facilitate exchange of electricity between the two neighboring countries and to be ready to buy electricity from other countries in the Eastern Africa Power Pool (EAPP), who have surplus power to sell. The countries with surplus power in the EAPP include Ethiopia, Kenya and Uganda.[8]

Construction in Burundi

Construction in Burundi was launched in August 2020. The engineering, procurement and construction (EPC) contract was awarded to a consortium comprising Transrail Lighting from India and Hanbaek from South Korea. The Burundi portion of this power transmission line is funded by loans to the government of Burundi, provided by the African Development Bank and the European Union.[1][6]

Construction in Rwanda

In 2018, it was reported that KfW was going to fund the Rwanda portion of this power line.[6] In 2022, online media reported that the entire line in both countries would be funded by the African Development Bank and the European Union.[1]

Other consideration

The power line is designed in a fashion that allows it to operate at either 110kV or 220kV, if and when the need arises. Work involves the construction of new substations at Kigoma and Gitega, as well as connecting both ends of the transmission power line to control centers in Kigali, Rwanda for the northern end and Bujumbura, Burundi for the southern end.[6]

See also

References

  1. ^ a b c Jean Marie Takouleu (1 August 2022). "Burundi/Rwanda: A power line will interconnect the two countries". Afrik21.africa. Paris, France. Retrieved 1 August 2022.
  2. ^ Google (2 August 2022). "Road Distance Between Kigali, Rwanda And Kigoma, Rwanda" (Map). Google Maps. Google. Retrieved 2 August 2022.
  3. ^ Google (2 August 2022). "Road Distance Between Kigoma, Rwanda And Butare, Rwanda" (Map). Google Maps. Google. Retrieved 2 August 2022.
  4. ^ Google (2 August 2022). "Road Distance Between Butare, Rwanda And Ngozi, Burundi" (Map). Google Maps. Google. Retrieved 2 August 2022.
  5. ^ Google (2 August 2022). "Road Distance Between Ngozi, Burundi And Gitega, Burundi" (Map). Google Maps. Google. Retrieved 2 August 2022.
  6. ^ a b c d e African Development Bank (August 2018). "Burundi-Rwanda Electricity Interconnection Project: Environmental And Social Impact Assessment (ESIA) Summary" (PDF). African Development Bank. Abidjan, Ivory Coast. Retrieved 2 August 2022.
  7. ^ "Women In Energy: Leader Immersed In Power Projects". ESI Africa. Cape Town, South Africa. December 2016. Retrieved 2 August 2022.
  8. ^ The EastAfrican (12 September 2015). "Regional high voltage lines expected by 2018". The EastAfrican. Nairobi, Kenya. Retrieved 2 August 2022.

External links