Project 23470 tugboat

From WikiProjectMed
(Redirected from Project 23470)
Jump to navigation Jump to search

Andrey Stepanov in 2020
Class overview
NameProject 23470
BuildersYaroslavl Shipyard
Operators Russian Navy
Built2014–present
In commission2020–present
Planned6[1]
Building1
Completed5
Active3
General characteristics
TypeTugboat
Displacement
  • 2,656 tons (standard load)
  • 3,401.5 tons (full load)[1][2]
Length69.75 m (228.8 ft)
Beam15 m (49 ft)
Draught5.11 m (16.8 ft)
Propulsion
  • 3 x 2850 kW diesel-generators
  • 2 x azipods
  • 2 x bow thrusters
Speed14 kn (26 km/h; 16 mph)
Range3,000 nmi (5,600 km; 3,500 mi)
Endurance30 days
Capacity300 tons
Complement33
Aviation facilities1 x helipad

Project 23470 is a series of seagoing tugboats developed by the Baltsudoproekt Central Design Bureau being built for the Russian Navy, intended to perform a variety of tasks including towing vessels, escorting vessels, extinguishing fires, and refloating vessels.[1][3]

Ships

Name Builder Laid down Launched Commissioned Fleet Status
Sergey Balk Yaroslavl Shipyard 30 October 2014 27 December 2016 21 February 2020 Black Sea Fleet Active[1][2]
Andrey Stepanov Yaroslavl Shipyard 23 July 2015 29 June 2017 June 2020 Pacific Fleet Active[1][4]
Kapitan Nayden Yaroslavl Shipyard 9 November 2016 28 November 2019 21 August 2022 Black Sea Fleet Active[5]
Kapitan Sergeev Yaroslavl Shipyard 2016 14 May 2021 Launched[1]
Kapitan Ushakov Yaroslavl Shipyard 14 June 2022 Launched[1]
Yaroslavl Shipyard Laid down[1]

See also

References

  1. ^ a b c d e f g h "Project 23470". russianships.info. Retrieved 21 April 2024.
  2. ^ a b "Seagoing Tug Sergey Balk". kchf.ru. Retrieved 21 April 2024.
  3. ^ "Shipment of air handling systems for a tugboat, project 23470". marinetec.com. 12 October 2016. Retrieved 21 April 2024.
  4. ^ "Acceptance certificate of sea tugboat Andrey Stepanov of project 23470 is signed". navyrecognition.com. Retrieved 21 April 2024.
  5. ^ "Seagoing Tug Kapitan Nayden". kchf.ru. Retrieved 21 April 2024.