File:View along SNETT Blackstone River bridge (1), October 2020.jpg
Jump to navigation
Jump to search
Size of this preview: 800 × 600 pixels. Other resolutions: 320 × 240 pixels | 640 × 480 pixels | 1,024 × 768 pixels | 1,280 × 960 pixels | 2,560 × 1,920 pixels | 4,032 × 3,024 pixels.
Original file (4,032 × 3,024 pixels, file size: 4.48 MB, MIME type: image/jpeg)
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 00:59, 3 March 2022 | 4,032 × 3,024 (4.48 MB) | commons>Pi.1415926535 | == {{int:filedesc}} == {{Information |Description ={{en|1=View along the side of the Southern New England Trunkline Trail bridge over the Blackstone River in October 2020. The pier and abutment build for a never-added second track are visible.}} |Source ={{own}} |Author =Pi.1415926535 |Date ={{taken on|2020-10-18}} |Permission = |other_versions = }} {{Location|42.016247|-71.538855|heading:WNW}} == {{int:license-header}} == {{self|cc-by-... |
File usage
There are no pages that use this file.